|
2006
Stephenson Ltd
Sheffield University Learning Resource Centre & Library
(Biaxial void forming for weight and CO2 reduction)
2005
Stephenson Ltd with
BRE, St George (South London) and White Young Green
St George Wharf
London
(Speed & efficiency through increased understanding of concrete frames)
2004
Imperial College &
the Construction Industry Training Board
Constructionarium
National Construction Centre, Norfolk
(Practical experience of construction for Higher Education students)
2003
Laing O'Rourke
Tower Place
London, E1
(Temporary works design and buildability)
2002
Whitby Bird & Partners
40 Grosvenor Place
London
(The use of precast concrete backing panels as loadbearing elements, removing the need for
internal shear walls)
2001 O'Rourke Group
DS5 Citigroup Tower
Canary Wharf, London
(Self climbing Jumpform System)
2000 Woolton
construction
30 Brompton Square
Knightsbridge, London
(Consistent production and effective use of self-compacting concrete)
1999 Osprey
Project Management Ltd
The Helicon, South Place, London
(Prefabricated steel/slab column connector maximising lettable area)
Jointly with
John Doyle Construction Ltd
Christ Church court
(Specialist contractor integration into the design and planning
stages plus use of computer modelling)
1998
The Reinforced Earth Company
Dingle Brook Bridge, Warrington
(Techspan Arch units combined with reinforced earth wingwalls)
1997
R O'Rourke Civil Engineering Ltd
British Airways plc
Prospect Park, Heathrow Airport
(The Rorcon Column Connector)
|